Tuesday 18 June 2013

The green roof goes up (not green yet though)

The waterproofing lining goes up.



Soil is added. This is the soil removed from the foundation footings. Lets hope for rain so that it grows (sorry folks).


I added some logs to encourage biodiversity, this should help to create different habitats for plants and bugs.


I started fitting out the inside. This is turning out to be the hardest bit, deciding where everything should go. I don't want to have to shift it all about again. Its all about ergonomics.





Monday 3 June 2013

more shed updates... and a lil wood burner.


Sheeps wool insulation and breathable membrane.


First side cladding


Opening front wall



Front clad and insulated then stained black. The two triangle bits below the roof will eventually be windows... as soon as i find the right sized bits of discarded perspex.


Here's a little log burner i'm making at work. The 200 x 200mm box section was an off cut from a job a couple of years ago. I stashed it knowing that it'd come in handy one day.